Page 13 - PosterMakmalJKA_Ogos2024
P. 13
HIGHWAY ENGINEERING LAB
DEPARTMENT OF CIVIL ENGINEERING
LEVEL 3, BLOCK N
LAB SUPERVISOR LABORATORY FUNCTION
DR. SUHANA KOTING • Adequate amount of asphalt to ensure
suhana_koting@um.edu.my a durable pavement
IR. DR. YUEN CHOON WAH • Adequate mix stability to prevent
yuencw@um.edu.my unacceptable distortion and
DR. MOHD RASDAN IBRAHIM diplacement when traffic load is
rasdan@um.edu.my applied
PIC LAB • Adequate voids in the total compacted
MUHAMAD IZZAT ZAKI mixture to permit a small amount of
izzat_zaki@um.edu.my compaction when tarffic load is applied
without bleeding and loss of stability.
• Adequate workability to falilitate
placement of the mix without
segregation
MAIN EQUIPMENT
• Marshall Compactor
• Marshall Stability Testing Machine
• Dynamic Shear Rheometer
• Viscometer
• Rolling Thin Film Oven
• Slab Compactor
• Umatta
• LA Machine