Page 13 - PosterMakmalJKA_Ogos2024
P. 13

HIGHWAY ENGINEERING LAB


                                                             DEPARTMENT OF CIVIL ENGINEERING
                                                             LEVEL 3, BLOCK N









           LAB SUPERVISOR                                              LABORATORY FUNCTION

           DR. SUHANA KOTING                               •    Adequate amount of asphalt to ensure
           suhana_koting@um.edu.my                              a durable pavement

           IR. DR. YUEN CHOON WAH                          •    Adequate  mix  stability  to  prevent
           yuencw@um.edu.my                                     unacceptable             distortion           and
           DR. MOHD RASDAN IBRAHIM                              diplacement  when  traffic  load  is

           rasdan@um.edu.my                                     applied
           PIC LAB                                         •    Adequate voids in the total compacted

           MUHAMAD IZZAT ZAKI                                   mixture  to  permit  a  small  amount  of
           izzat_zaki@um.edu.my                                 compaction when tarffic load is applied
                                                                without bleeding and loss of stability.

                                                           •    Adequate  workability  to  falilitate
                                                                placement        of     the     mix      without
                                                                segregation

















                        MAIN EQUIPMENT

         •    Marshall Compactor
         •    Marshall Stability Testing Machine
         •    Dynamic Shear Rheometer

         •    Viscometer
         •    Rolling Thin Film Oven

         •    Slab Compactor
         •    Umatta
         •    LA Machine
   8   9   10   11   12   13   14   15   16   17