Page 95 -
P. 95

COURSE INFORMATION FOR CURRENT SEMESTER/TERM


            Teaching Schedule

                                                                                      References/Teaching Materials/
                Week                     Lecture/Tutorial/Assignment Topic
                                                                                              Equipment
                  1       The importance and objective of survey works to civil engineers.   Reference books/notes/
                          Basic principles in measurement. Survey concept from whole to parts.
                                                                                           OHP/LCD projector
                          Summary of mapping system in Malaysia.
                  2       Basic elements of a theodolite. Test, use and correction of errors of a   Reference books/notes/
                          theodolite.                                                      OHP/LCD projector

                  3       Procedure of traversing by theodolite, observation, booking, reduction   Reference books/notes/
                          and adjustment of data.                                          OHP/LCD projector
                  4       Sources of errors in theodolite traversing works and steps required to   Reference books/notes/
                          remove them.                                                     OHP/LCD projector

                  5                                                                      Reference books/notes/
                          Computation of coordinates and area by coordinate method.
                                                                                           OHP/LCD projector
                  6       Principles of levelling. Equipment of levelling. Test and adjustment of a   Reference books/notes/
                          level instrument.                                                OHP/LCD projector
                  7                                                                      Reference books/notes/
                          Work procedure on levelling, reading, booking and reduction of data.
                                                                                           OHP/LCD projector

                  8       Sources of error in levelling and methods to eliminate them. Contouring   Reference books/notes/
                          using leveller.                                                  OHP/LCD projector

                  9       The  theory  and  principle  of  Stadia  Method.  Measurement  by  stadia   Reference books/notes/
                          method for horizontal sight distance.                            OHP/LCD projector
                 10       Measurement by stadia method for not horizontal sight distance. Sub-
                          stense Bar method, Optical Wedge and automatic reduction       Reference books/notes/

                          system. Contour and taking details by tacheometry. Errors in tacheom-  OHP/LCD projector
                          etry works.
                          Principles  of  planimeter  and  its  use.  Area  enclosed  by  straight  lines,
                 11
                          coordinate  method,  bearing  method  and  distances.  Computation  of   Reference books/notes/
                          area of irregular figures. Trapezoidal and Simpson's rules for computa-  OHP/LCD projector
                          tion of area.

                 12       Computation of earthwork by cross and longitudinal section. Volume by   Reference books/notes/
                          "mean areas" and "end areas". Volume based on “prismoidal” formu-  OHP/LCD projector
                          lae. Effect of curvature in computation of earthwork volume based on

                 13       Design of circular curve, transition curve and vertical curve. Computa-  Reference books/notes/
                          tion for setting out curve at field. Equation of transition curve. Methods   OHP/LCD projector
                          for setting out curve; tape method, two theodolite method and method

                 14       Methods  for  setting  out  curve;  tape  method,  two  theodolites  method   Reference books/notes/
                          and method using control remote station. Problems  with sighting dis-
                          tance at field.                                                  OHP/LCD projector

             UM-PT01-PK03-BR004(BI)-S04
   90   91   92   93   94   95   96   97   98   99   100