Page 27 - Pelan Strategik ICT
P. 27
2012 - 2014 THE CENTRE FOR INFORMATION TECHNOLOGY - ICT STRATEGIC
PLAN
STRATEGIC PLAN 1 - TO DEVELOP AN ADVANCED AND ESTABLISHED INFRASTRUCTURE AND ICT
SERVICES TO SUPPORT TEACHING, LEARNING AND RESEARCH UNIVERSITY
YEAR 2012 – 2014 KPI
Results Action Plan Time
Remarks
Period
1.1 Installation of redundant links to major Jun 2012 –
Most advanced connections in the campus network Dec 2013
networks,
resilient, stable
Replacing Fast Ethernet Backbone Sep 2012 - Backbone upgrade
and scalable
to 10GE Backbone Dec 2013 process involves 3 phases.
Installation of Single Mode Fibre to replace
Multi Mode Fibre which is longer than 500
meters
1.2 To replace core switches, distribution Jan 2013 -
Upgrading the switches, access switches, gigabit Dec2015
whole campus backbone, high performance data centre
network switches
Upgrading IPS, web filtering system
1.3 To install Redundancy for firewall DMZ Jun 2012 –
Firewall and Server farm Dec 2013
Redundancy
1.4 To renovate network room and upgrade Jun 2012 –
Upgrading network hardware / equipment in the Dec 2012
Network Room Network Room
1.5 Implement IP-based telephony system Apr 2012 –
IP-based PABX Dec 2012
25