Page 27 - Pelan Strategik ICT
P. 27

2012 - 2014      THE CENTRE FOR INFORMATION TECHNOLOGY - ICT STRATEGIC
           PLAN


              STRATEGIC PLAN 1 - TO DEVELOP AN ADVANCED AND ESTABLISHED INFRASTRUCTURE AND ICT
                        SERVICES TO SUPPORT TEACHING, LEARNING AND RESEARCH UNIVERSITY

                                                                                 YEAR 2012 – 2014 KPI
             Results                        Action Plan                    Time
                                                                                               Remarks
                                                                           Period
          1.1                Installation of redundant links to major     Jun 2012 –
          Most advanced      connections in the campus network            Dec 2013
          networks,
          resilient, stable
                             Replacing Fast Ethernet Backbone            Sep 2012 -    Backbone upgrade
          and scalable
                             to 10GE Backbone                             Dec 2013     process involves 3 phases.

                             Installation of Single Mode Fibre to replace
                             Multi Mode Fibre which is longer than 500
                             meters
          1.2                To replace core switches, distribution       Jan 2013 -
          Upgrading the      switches, access switches, gigabit            Dec2015
          whole campus       backbone, high performance data centre
          network            switches


                             Upgrading IPS, web filtering system
          1.3                To install Redundancy for firewall DMZ       Jun 2012 –
          Firewall           and Server farm                               Dec 2013
          Redundancy

          1.4                To renovate network room and upgrade         Jun 2012 –
          Upgrading          network hardware / equipment in the           Dec 2012
          Network Room       Network Room
          1.5                Implement IP-based telephony system         Apr 2012 –
          IP-based PABX                                                   Dec 2012