             Activity              Provisional            Full                         Reaccreditation
             Physical Site Visit   Not relevant.          2 days.                      2 days.

                                                          Make sure everything is in order.   Make sure everything
                                                          Refer to the guideline.      is in order. Refer to the
                                                                                       guideline.
             Summary Report        This is usually given during  Within 3 weeks after the visit.  Within 2 weeks after the
                                   a meeting.                                          faculty’s level exit meeting.
             Programme Improvement   Once everything is sorted   Within 2 weeks after receiving   Within 2 weeks after
             Plan (PIP)            out. Within 6 months after   Summary Report.        receiving Summary Report.
                                   Summary Report
             Head of Panel to comment  1 week after receiving PIP  1 week after receiving PIP  1 week after receiving PIP
             on PIP. If the PIP is
             satisfactory, this will not
             be sent to the Programme
             owner.
             Improvement on PIP.   2 weeks after receiving   2 weeks after receiving Head of   2 weeks after receiving
                                   Head of Panel comments  Panel comments              Head of Panel comments
             Inform Programme that it   One week before JKSA  One week before JKSA     One week before JKSA
             will be tabled at JKSA
             Prepare other documents   Before JKSA (if the   Before JKSA (if the programme is to   Before JKSA (if the
             for the submission to MQA  programme is to be   be recommended for approval to   programme is to be
                                   recommended for approval  JKSA)                     recommended for approval
                                   to JKSA)                                            to JKSA)
             JKSA                  When the PIP is approved   When the PIP is approved by the   When the PIP is approved
                                   by the PoA             PoA                          by the PoA
             Senate Meeting        After approval at JKSA  After approval at JKSA      After approval at JKSA
             Provide other documents   Within 1 month after   Within 1 month after Senate’s   Within 1 month after
             for the submission to MQA  Senate’s Approval  Approval                    Senate’s Approval